Pikes Peak Cog Railway

The 1949 Detroit conventioneer who collected the menus and timetables either had time when laying over in Denver to take a trip down to Colorado Springs or picked up this brochure for future reference. The cog railway trip took 4-1/2 hours, and when added to the time required to get to and from Colorado Springs, taking the trip would have been possible only if the charter train spent an entire day in Denver.

Click image to download a 1.4-MB PDF of this brochure.

Andropause can also be defined canada viagra generic as a “mid-life crisis” for men when the testosterone production reduces. It also gives information about Austin eating levitra pills from canada and shopping. So much so these sorts of comments can keep you away from each other, resulting in the lack of satisfaction http://deeprootsmag.org/2016/09/12/another-archeophone-treasure/ viagra in usa between couples and that’s when you run into problems.” Gossage, who has been driving for respective years may not recognize that how many minutiae a new driver and under the age of 25. One of the major issues generika cialis among so many today is sexual health of a person. Built in 1891 by the founder of the Simmons Mattress Company, the cog railway had no sidings in 1949. The trip up the mountain took more than an hour, so the schedule called for a round trip in the morning and a second round trip in the afternoon. The railway was able to meet higher demand by running two trains, one behind the other, on each schedule, one being powered by Diesel and the other steam. Since then, sidings have been added so they can run eight round trips per day.

The 1949 brochure also gave tourists the option of taking the train up to the summit of Pikes Peak and then taking a “Grey Line deluxe” limousine down the road, giving them a completely different view. The canvas-topped vehicle pictured in the brochure has four rows of seats and probably could hold 11 passengers comfortably and 15 in a pinch.


Leave a Reply