October, 1950 Rio Grande Timetable

Issued just three months after yesterday’s timetable, this one differs on the inside in just two places that I can find. First, the three-day-a-week train between Durango and Silverton has been reduced to Wednesday’s only, which was probably the winter schedule for that train.

Click image to download an 13.7-MB PDF of this timetable.

The second change was a new full-page ad for the Ski Train and other Rio Grande trains to winter ski areas. This ad on page 14 replaced an ad for the vista-domed Royal Gorge in the previous timetable.


Leave a Reply