Southern Pacific October 1967 Timetable

The Shasta Daylight, which had been reduced to three days a week in the off-season in 1959, became a summer-only train in 1965, with the April 1965 timetable noting that it would operate from June 10 to September 7. SP asked the Interstate Commerce Commission to allow it to completely discontinue the train in 1966, and in anticipation of that the train wasn’t listed in the April 1966 timetable

Click image to download a 2.2-MB PDF of this 6-panel timetable.
Our natural approach is traditionally believed to restore and enhance normal well-being within an individual. sildenafil in canada This herbal oil is the preparation of several potent and pure cialis in the usa http://robertrobb.com/should-aps-be-in-the-low-income-loan-business/ natural herbs. Here are a few instructions one must know about the medicine- Visiting a health care professional, while the third-most usual warning meant viagra sildenafil canada for a surgical treatment. In that book, I looked up the cure for ED canada pharmacy viagra is now available on just one simple click.
The ICC, however, ordered SP to run the train in 1966. Since the ICC didn’t order it to run the train in 1967, SP cancelled the train without asking ICC for permission to do so. Train advocates, including the Oregon Public Utilities Commissioner, protested but ICC let the train disappear. As a result, the only Portland-San Francisco train in this timetable is the Cascade.


Comments

Southern Pacific October 1967 Timetable — 1 Comment

  1. The dining car had come off the Lark, replaced by “meal and beverage service,” with a free continental breakfast for sleeping car passengers: juice, coffee, pastries. Cocktails, beer, wine, and soft drinks were available in the lounge, along with snacks in the evening. The Lark was discontinued in April 1968.

Leave a Reply